The crew is focused on finish work now that we are two and a half weeks away from our move-in day (Dec. 10!). It's very exciting to watch everything come together!
Our farmers sink arrived this week. We love it! |
The crown moulding is going in. |
The preliminary structure for the island was built. It will soon be a large cherry farmer's table. |
Our mantle was installed. It's a reclaimed board from an old barn. Barn boards were also installed above the mantel; they will soon be painted white. |
The kids' bath is now tiled. |
Master shower tile |
Banisters are starting to be installed and the treads went down on the stairs. |
The outlines for wainscoting have begun. Soon much of the downstairs will have wainscoting. |
The ceiling of the porch was installed. |
Cedar shakes are starting to go up on the garage and shed. |
The septic was installed and they've begun bringing a lot of fill into the lot to level it off with the road and bury the septic. More fill is on its way! |