The crew is focused on finish work now that we are two and a half weeks away from our move-in day (Dec. 10!). It's very exciting to watch everything come together!


Our farmers sink arrived this week. We love it!
The crown moulding is going in.

The preliminary structure for the island was built. It will soon be a large cherry farmer's table.
Our mantle was installed. It's a reclaimed board from an old barn. Barn boards were also installed above the mantel; they will soon be painted white.

The kids' bath is now tiled.
Master shower tile

Banisters are starting to be installed and the treads went down on the stairs.
The outlines for wainscoting have begun. Soon much of the downstairs will have wainscoting.
The ceiling of the porch was installed.

Cedar shakes are starting to go up on the garage and shed.

The septic was installed and they've begun bringing a lot of fill into the lot to level it off with the road and bury the septic. More fill is on its way!